OUR PROJECTS

Below you will find some key information about those of our projects that are approaching ready-to-build (RTB) status in the near future. Our key design philosophy always includes:

  • A land area with minimal environmental impacts and easy set-up for the PV plant foundations. 
  • Close proximity to an existing substation with capacity available immediately. 
  • Technical design that allows the implementor to follow their preference, taken into account during the permitting process.

Nakkila_2

Location: Nakkila, Southern Finland
Type: BESS
Nominal Power: 9,9 MW

Area: 0,4 ha
Status: Permitting. Ready-to-build “RTB” in 2025

Varila_1

Location: Sastamala, Southern Finland
Type: Hybrid (Solar and BESS)
Nominal Power PV: 8.5 MWp, Combined capacity up to 15 MW

Area: 11,5 ha
Status: Permitting almost complete. Ready-to-build “RTB” in 2025

Isokylä_1

Location: Salo, Southern Finland
Type: Hybrid (Solar and BESS)
Nominal Power PV: 11,4 MWp, Combined capacity up to 15 MW  

Area: 14 ha
Status: Permitting. Expected to achieve ready-to-build “RTB” status in 2026

Perniö_1

Location: Salo, Southern Finland
Type: Solar
Nominal Power: 11,0 MWp

Area: 15,3 ha
Status: Permitting. Expected to achieve ready-to-build “RTB” status in 2025

Karkku_1

Location: Sastamala, Southern Finland
Type: Solar
Nominal Power: 14,3 MWp

Area: 18,23 ha
Status: Permitting. Expected to achieve ready-to-build “RTB” status in 2026